Fire stopping in Tower Hamlets
Tall blocks, busy risers, years of cables pulled through by whoever came last. We find the open holes and close them properly.
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
Tower Hamlets has office towers at Canary Wharf, residential towers on the Isle of Dogs, post-war estates in Bethnal Green and Poplar, and warehouse flats in Wapping. Most of these buildings have been rewired and re-plumbed more than once since they were built. The fire walls are usually still standing. The holes in them are the problem.

What we do in the borough
The work is carried out by our BM TRADA / FIRAS-certificated contractors, who cover Tower Hamlets and the areas next to it. Most jobs start with a compartmentation survey and move on to fire stopping installation. Tall buildings get their own page on riser and service shaft sealing. Plastic pipes are under fire collars, and ceiling voids above corridors under cavity barriers.
Price
Fire stopping jobs usually start at around £2,000 plus VAT, and compartmentation surveys are priced from the floor plans, because a six-storey block with one stair in Bow and a 20-storey tower with two cores on the Isle of Dogs take very different amounts of time. A fire risk assessment is a separate service from either.

Fire stopping work in Tower Hamlets
How it works
- 1Send the detailsThe postcode, the type of building and a photo or two of the gaps.
- 2Survey and written priceWe walk the building, record each breach and price the sealing.
- 3Sealed and recordedEach seal is fixed, labelled and photographed for your fire safety file.
Where we go
Our certificated contractors cover the whole of Tower Hamlets, from Spitalfields out to Bow and down to the Isle of Dogs. Pick an area to read about the buildings we see there.
Send us the page that lists them, or a few photos with a tape measure in shot, and the postcode. We come back with a written price.