Can residents stay in during fire stopping work?
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
Yes, nearly always. In a block of flats most of the sealing happens in the common parts: riser cupboards on the landings, meter cupboards, the ceiling void above the corridor, the bin store and the plant room. Nobody needs to leave their flat for any of that.
What residents notice is a tower scaffold on the landing for an hour, a few ceiling tiles lifted outside their door, the smell of sealant in a riser cupboard and a contractor asking them to move a bike out of a cupboard that holds the meters. Mastic and batts are not noisy to fit. Drilling for collar fixings into a concrete slab is, but only for a few seconds per pipe.
A flat needs a visit when the seal can only be reached from inside it. That happens in converted houses where the soil stack is boxed in inside each bathroom, in blocks where the riser door opens from a flat's hallway rather than the landing, and where a collar has to go on the ceiling side of a slab and the ceiling in question belongs to a flat. Those visits are booked with the resident, usually through the managing agent, and take anything from twenty minutes to an hour or so.
In tall blocks on the Isle of Dogs or in Poplar, a letter from the agent a week or two ahead, saying which floors are being done on which days, saves most of the questions on the day.

Send us the page that lists them, or a few photos with a tape measure in shot, and the postcode. We come back with a written price.