Some risers are built as one protected shaft, with fire-rated walls and a fire door on every floor and the floors left open inside. Others are sealed at each slab. It changes the job completely, so we ask for the fire strategy or the original drawings first, and where nobody has them the survey has to work it out from what is there.

The record, floor by floor
Level 12. Old seal round soil stack cracked, cut out and resealed. Batt patched where two newer cables went through. Photos 12-1, 12-2.
Level 11. Seal sound. Labelled and photographed, no work. Photo 11-1.
Level 10. Open hole round fibre bundle, 90mm. Coated batt and mastic. Photo 10-1.
Floors that needed nothing still get a line and a photo, so the record covers the whole riser.
On the day
Locked riser doors, cupboards full of residents' bikes and boxes, and live electrics that need an electrician present are what slow a riser job down. Gas pipes are worked round and never touched.
For blocks in England with two or more flats, the Fire Safety Act 2021 confirmed that the structure and the walls between flats and common parts fall under the Regulatory Reform (Fire Safety) Order 2005. Your fire risk assessor sets what needs doing and by when.
Riser sealing is carried out by our BM TRADA / FIRAS-certificated contractors.
Send us the page that lists them, or a few photos with a tape measure in shot, and the postcode. We come back with a written price.