Fire stopping in Canary Wharf
Floors change tenants. Each fit-out puts new holes in the core walls above the ceiling.
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
Landlord walls, tenant works
In a multi-let tower the landlord usually looks after the core while the tenant looks after the floor, which means a fit-out contractor working for the tenant can end up cutting through a wall the landlord is responsible for. That is the reason most building managers ask for fire stopping records at the end of a fit-out. When the record is missing, or it is a handful of photos with no numbers on them, it makes sense to have the core walls on that floor checked before the next tenant arrives.

Example: one floor after a fit-out
Suppose the incoming tenant has built a comms room against the core. Above the ceiling there could now be eleven new penetrations in the core wall, made up of four cable trays, three copper pipes, two plastic condensate drains, a sprinkler branch and an old duct opening that now holds nothing at all.
Out of hours
Ceiling work on a floor that people are using is often done early, late or at the weekend, depending on what the building allows, and we plan the visits round those rules.
The work is carried out by our BM TRADA / FIRAS-certificated contractors, who cover Canary Wharf and the rest of Tower Hamlets.
Send us the page that lists them, or a few photos with a tape measure in shot, and the postcode. We come back with a written price.