Fire stopping on the Isle of Dogs
Residential towers next to older council blocks. Very different buildings, the same open risers.
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
High-rise duties
For residential buildings in England that are at least 18 metres tall or have at least seven storeys, the Fire Safety (England) Regulations 2022 add duties for the responsible person, such as floor plans for the fire service and wayfinding signs. They do not set a fire stopping schedule. But a building with that much height relies heavily on each floor holding a fire in place, and the fire risk assessment for a tower usually looks hard at the risers.

Sprinkler mains
Many tall residential buildings have sprinklers, and the sprinkler main runs up a riser with branches into each corridor or flat. Steel pipe takes a different seal from plastic. Where a branch leaves the riser through the corridor wall, we often expect to find the gap round it left open, or filled with general-purpose foam. Both get cut back and sealed with a product tested for steel pipe at that wall's rating.
Planning the visit
In a 30-storey tower, half the time on site can go on lifts and keys. A day that starts with a list of the risers, the floor plans and the building manager's number gets through a lot more floors than one that does not.
Work on the Isle of Dogs is carried out by our BM TRADA / FIRAS-certificated contractors.
Send us the page that lists them, or a few photos with a tape measure in shot, and the postcode. We come back with a written price.