How long does a compartmentation survey take?
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
About a day on site for a three or four storey block with one stair and a loft. Several days for a tower with two cores, a basement car park and plant on the roof, and then time after the visit for the photos and the schedule.
The number of storeys is only a rough guide. The time goes on the places that have to be climbed into.
Ceiling voids take longest. On an office floor the surveyor lifts a tile every few metres along each corridor wall, looks along the head of the wall with a torch and photographs what is there. A flats corridor with a plaster ceiling and two hatches is quicker, though it can hide more.
Risers come next. Ten floors with two risers on each is twenty cupboards, photographed top and bottom.
Access can double it. A concierge with a full set of keys saves hours. Riser keys held by another contractor, or a roof plant room that needs a separate appointment, can add a second visit.
Plans, the number of storeys and the number of stairs are enough for us to say how many days to expect. The compartmentation survey page shows what the report looks like.

Send us the page that lists them, or a few photos with a tape measure in shot, and the postcode. We come back with a written price.